Let us start with the basics which is to make sure that everyone understands what the bond claim deadlines are because you will have no rights if you do not timely comply with the requirements of both the bond and Florida statutes regarding the bond claim process.

Now this can be broken down into two sections. You are either working on a job that is a public job or a private job. In each of these situations, the job may be bonded.  

Bond Claim Deadlines for Private Bonded Projects

If you are working on a private project, this can be a condo tower, an office building, or a warehouse. If the contractor has a bond, these are the requirements that you need to follow.  

i. General rules for subcontractors

Send Notice to Owner  

If you are a subcontractor, it means you have a direct contract with the general contractor and that is the party that has the bond. So if the contract is with the bonded prime contractor, you do not need to send a Notice to Owner/Notice to Contractor, or any other type of preliminary notice.  

But having said that, it is strongly recommended that you do it. You should have a system in place in your office so that any job over a certain amount of money gets noticed no matter what. That could be $500 or $2,500, but any time you have a construction project that is more than that number, you automatically send a Notice to Owner.  

This way you do not need to worry about situations in which sometimes you have to send a notice or you do not. It is those nuances in the lien law that when people try to manage, they end up making mistakes.  

If you have a contract with the bonded contractor, which makes you a subcontractor, you do not need to send a Notice to Owner.  

Send Notice of Nonpayment  

The next notice you have to send is what is called a Notice of Nonpayment. It is a specific form found in Florida statutes, and that needs to be received by the contractor and surety no later than 90 calendar days from your last work or delivery of materials on the project.  

You can do the Notice of Nonpayment yourself or you can hire a company like us, SunRay to do it.

SunRay deadline calculator

This notice must be served via certified mail. Ninety days is not the same as three months; it is 90 calendar days starting from the first day after your last day of work. So, if you deliver your last palette of materials to the job site today, tomorrow is Day 1 and you count all calendar days, weekends, and legal holidays, all the way through the 90 days.  

If the 90th day happens to land on a Saturday, Sunday, or legal holiday then you should roll it to the next day. So, if the 90th day is a Saturday, it rolls to Sunday. Sunday rolls to Monday, and if Monday happens to be a holiday, it will finally roll to Tuesday.  

There are instances when you may have more than 90 days, but it is very rare. And it has to be received by the other side by the 90th day. So, if you are putting it in the mail, and sending it out by certified mail on the 89th day, it is probably not going to make it there in time.  

So, you need to work on this early. Obviously you can send it overnight mail, but that still also is not guaranteed.  

File suit on the bond  

The last requirement is that you need to file a lawsuit on your claim against the bond no later than one year from your last delivery of materials or work on the job.  

So, as a subcontractor on a bonded project, these are the rules that you need to make sure you follow.  

ii. General rules for sub-subcontractors, material suppliers to subcontractors, and sub-subcontractors

Now if you are not the subcontractor, maybe you are a sub-subcontractor, a material supplier to the subcontractor or a material supplier to the sub-subcontractor, the rules are slightly different.  

Send Notice to Owner  

Step one is that if you are in that category, you do need to send a Notice to Owner/Notice to Contractor no later than 45 days from your first work or delivery of materials on the project 45 days is the date in which that document needs to be received. You should be doing it much sooner than that.

notice of nonpayment

Send Notice of Nonpayment  

You also need to serve that Notice of Nonpayment no later than 90 days from your last work or delivery of materials on the construction project.  

File suit on the bond  

You should file your lawsuit on the bond within one year of your last work or delivery of materials to the project.  

The lawsuit has to be a real lawsuit. You have to hire a lawyer, and they have to file the lawsuit with the court and it has to be no later than one year from your last date of work or delivery of materials to the job site. It does not matter was the surety may say. Whether it is them investigating the claim, that they will get back to you, you may have filled out paperwork and sent it in, but none of that changes the one-year deadline.  

So do not be fooled by thinking that something has happened that gives you more time than that one year.  

Check for subcontractor bonds  

If you are a sub-subcontractor or material supplier to the subcontractor, or material supplier to the sub-subcontractor, there may in fact be another bond that you can make a claim against. That is the bond of the subcontractor. There are instances in which the prime contractor may not be bonded, and you may have lien rights on the project.  

But at the same time, the subcontractor may have a bond. You may make a claim against that subcontractor payment bond. But how do you know if you are a sub-subcontractor if the subcontractor has a bond? The best way to find out is to ask the general contractor. That subcontractor bond will not be recorded in the public record. There may be no evidence in the court filings, or in the public records of the county where the project is located because there is no obligation to record it.  

However, if you reach out to the general contractor, they will likely give you a copy because they want to make sure that if you have a claim, that you go after the subcontractor’s bond, which is why they will likely want the subcontractor to have a bond, and leave them alone.  

So, you can make a written request to the contractor. It is suggested that you simply start with asking them by sending an email. But there is a formal process through which you can request a copy of the bond of the subcontractor. You send that request in writing via certified mail to the contractor and you can also send it to the subcontractor, and they are obligated to give you a copy of that bond.  

If this subcontractor has a bond, you have rights against that sub-bond in addition to possibly also having lien rights or rights against the general contractor’s bond. So just know that that bond may exist. We typically see it on much larger jobs where the subcontractor’s contract value is very large. So, in order mitigate some risk, the contractor may demand that the subcontractor provide a bond.  

Just also know that if you happen to have messed up your dates, like maybe you did not timely serve a Notice to Owner or you were late on your Notice of Nonpayment or lien, if the subcontractor has a bond, even if you missed your lien or prime contractor bond deadlines, you can always go after the subcontractor’s bond.  

Subcontractor bonds are governed by whatever the terms of that bond are. That is why you need to get a copy, so that you can read it and determine what you have to do to make a claim.  

Bond Claim Deadlines for State Public Bonded Projects

Now we come to public bonded projects. A public bonded project is a public school or a public hospital, but not all schools and hospitals are public. It could be a private school, charter school, or private hospital. So keep in mind that not every school, hospital, or facility that would normally seem public, is automatically public.  

i. General rules for sub-contractors

So, assuming that you are working on a state public bonded project, here are the rules.  

Notice to Owner

If you are a subcontractor, meaning that you have a contract with the bonded prime contractor, you do not need to send a Notice to Owner. This document goes out 45 days from your first work. It is not required if you are a subcontractor to a bonded prime contractor on a public job.  

Notice of Nonpayment  

Most people also do not know this – you do not need send a Notice of Nonpayment either. This document goes out no later than 90 days from your last work.  

File suit on the bond

There is only one requirement if you are a subcontractor to a bonded contract on a public job – you have to file a lawsuit within one year of your last work or delivery of materials to the project.  

Now, even though you there is not requirement to send a Notice to Owner or Notice of Nonpayment, you are strongly encouraged to do so. You should get into the habit of knowing that no later than 45 days you are going to serve your Notice to Owner, and within no later than 90 days you are going to record a lien serve your Notice of Nonpayment.  

But in the off chance that you are working on a state public bonded project, you do not need to send either of them and you would still have rights on the general contractor’s payment bond.  

ii. General rules for sub-subcontractors, material suppliers to subcontractors, and sub-subcontractors

If you are a sub-subcontractor, material supplier to a subcontractor, or a sub-subcontractor, you now need to do everything.  

Notice to Owner/Notice to Contractor  

You need to timely serve a Notice to Owner no later than 45 days from your first work or delivery of materials on the project.

notice to owner

Notice of Nonpayment  

You need to serve a Notice of Nonpayment no later than 90 days from your last work.  

File suit on the bond

You need to file your lawsuit no later than one year from your last work or delivery of material on the project.  

Check for subcontractor bonds  

Remember that just like on public jobs, the party that you have a contract with or the party that stands between you and the general contractor may have a bond. And if they do, you may be able to make a claim against that subcontractor’s bond.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

About Author

ARIELA WAGNER

Ariela Wagner

Ariela is the president and founder of SunRay Construction Solutions. She has over 18 years of construction industry experience. Read More>

WORKER SMILING

File your Notice of Commencement in Florida today!

File today

Let us start with the basics which is to make sure that everyone understands what the bond claim deadlines are because you will have no rights if you do not timely comply with the requirements of both the bond and Florida statutes regarding the bond claim process.

Now this can be broken down into two sections. You are either working on a job that is a public job or a private job. In each of these situations, the job may be bonded.  

Bond Claim Deadlines for Private Bonded Projects

If you are working on a private project, this can be a condo tower, an office building, or a warehouse. If the contractor has a bond, these are the requirements that you need to follow.  

i. General rules for subcontractors

Send Notice to Owner  

If you are a subcontractor, it means you have a direct contract with the general contractor and that is the party that has the bond. So if the contract is with the bonded prime contractor, you do not need to send a Notice to Owner/Notice to Contractor, or any other type of preliminary notice.  

But having said that, it is strongly recommended that you do it. You should have a system in place in your office so that any job over a certain amount of money gets noticed no matter what. That could be $500 or $2,500, but any time you have a construction project that is more than that number, you automatically send a Notice to Owner.  

This way you do not need to worry about situations in which sometimes you have to send a notice or you do not. It is those nuances in the lien law that when people try to manage, they end up making mistakes.  

If you have a contract with the bonded contractor, which makes you a subcontractor, you do not need to send a Notice to Owner.  

Send Notice of Nonpayment  

The next notice you have to send is what is called a Notice of Nonpayment. It is a specific form found in Florida statutes, and that needs to be received by the contractor and surety no later than 90 calendar days from your last work or delivery of materials on the project.  

You can do the Notice of Nonpayment yourself or you can hire a company like us, SunRay to do it.

SunRay deadline calculator

This notice must be served via certified mail. Ninety days is not the same as three months; it is 90 calendar days starting from the first day after your last day of work. So, if you deliver your last palette of materials to the job site today, tomorrow is Day 1 and you count all calendar days, weekends, and legal holidays, all the way through the 90 days.  

If the 90th day happens to land on a Saturday, Sunday, or legal holiday then you should roll it to the next day. So, if the 90th day is a Saturday, it rolls to Sunday. Sunday rolls to Monday, and if Monday happens to be a holiday, it will finally roll to Tuesday.  

There are instances when you may have more than 90 days, but it is very rare. And it has to be received by the other side by the 90th day. So, if you are putting it in the mail, and sending it out by certified mail on the 89th day, it is probably not going to make it there in time.  

So, you need to work on this early. Obviously you can send it overnight mail, but that still also is not guaranteed.  

File suit on the bond  

The last requirement is that you need to file a lawsuit on your claim against the bond no later than one year from your last delivery of materials or work on the job.  

So, as a subcontractor on a bonded project, these are the rules that you need to make sure you follow.  

ii. General rules for sub-subcontractors, material suppliers to subcontractors, and sub-subcontractors

Now if you are not the subcontractor, maybe you are a sub-subcontractor, a material supplier to the subcontractor or a material supplier to the sub-subcontractor, the rules are slightly different.  

Send Notice to Owner  

Step one is that if you are in that category, you do need to send a Notice to Owner/Notice to Contractor no later than 45 days from your first work or delivery of materials on the project 45 days is the date in which that document needs to be received. You should be doing it much sooner than that.

notice of nonpayment

Send Notice of Nonpayment  

You also need to serve that Notice of Nonpayment no later than 90 days from your last work or delivery of materials on the construction project.  

File suit on the bond  

You should file your lawsuit on the bond within one year of your last work or delivery of materials to the project.  

The lawsuit has to be a real lawsuit. You have to hire a lawyer, and they have to file the lawsuit with the court and it has to be no later than one year from your last date of work or delivery of materials to the job site. It does not matter was the surety may say. Whether it is them investigating the claim, that they will get back to you, you may have filled out paperwork and sent it in, but none of that changes the one-year deadline.  

So do not be fooled by thinking that something has happened that gives you more time than that one year.  

Check for subcontractor bonds  

If you are a sub-subcontractor or material supplier to the subcontractor, or material supplier to the sub-subcontractor, there may in fact be another bond that you can make a claim against. That is the bond of the subcontractor. There are instances in which the prime contractor may not be bonded, and you may have lien rights on the project.  

But at the same time, the subcontractor may have a bond. You may make a claim against that subcontractor payment bond. But how do you know if you are a sub-subcontractor if the subcontractor has a bond? The best way to find out is to ask the general contractor. That subcontractor bond will not be recorded in the public record. There may be no evidence in the court filings, or in the public records of the county where the project is located because there is no obligation to record it.  

However, if you reach out to the general contractor, they will likely give you a copy because they want to make sure that if you have a claim, that you go after the subcontractor’s bond, which is why they will likely want the subcontractor to have a bond, and leave them alone.  

So, you can make a written request to the contractor. It is suggested that you simply start with asking them by sending an email. But there is a formal process through which you can request a copy of the bond of the subcontractor. You send that request in writing via certified mail to the contractor and you can also send it to the subcontractor, and they are obligated to give you a copy of that bond.  

If this subcontractor has a bond, you have rights against that sub-bond in addition to possibly also having lien rights or rights against the general contractor’s bond. So just know that that bond may exist. We typically see it on much larger jobs where the subcontractor’s contract value is very large. So, in order mitigate some risk, the contractor may demand that the subcontractor provide a bond.  

Just also know that if you happen to have messed up your dates, like maybe you did not timely serve a Notice to Owner or you were late on your Notice of Nonpayment or lien, if the subcontractor has a bond, even if you missed your lien or prime contractor bond deadlines, you can always go after the subcontractor’s bond.  

Subcontractor bonds are governed by whatever the terms of that bond are. That is why you need to get a copy, so that you can read it and determine what you have to do to make a claim.  

Bond Claim Deadlines for State Public Bonded Projects

Now we come to public bonded projects. A public bonded project is a public school or a public hospital, but not all schools and hospitals are public. It could be a private school, charter school, or private hospital. So keep in mind that not every school, hospital, or facility that would normally seem public, is automatically public.  

i. General rules for sub-contractors

So, assuming that you are working on a state public bonded project, here are the rules.  

Notice to Owner

If you are a subcontractor, meaning that you have a contract with the bonded prime contractor, you do not need to send a Notice to Owner. This document goes out 45 days from your first work. It is not required if you are a subcontractor to a bonded prime contractor on a public job.  

Notice of Nonpayment  

Most people also do not know this – you do not need send a Notice of Nonpayment either. This document goes out no later than 90 days from your last work.  

File suit on the bond

There is only one requirement if you are a subcontractor to a bonded contract on a public job – you have to file a lawsuit within one year of your last work or delivery of materials to the project.  

Now, even though you there is not requirement to send a Notice to Owner or Notice of Nonpayment, you are strongly encouraged to do so. You should get into the habit of knowing that no later than 45 days you are going to serve your Notice to Owner, and within no later than 90 days you are going to record a lien serve your Notice of Nonpayment.  

But in the off chance that you are working on a state public bonded project, you do not need to send either of them and you would still have rights on the general contractor’s payment bond.  

ii. General rules for sub-subcontractors, material suppliers to subcontractors, and sub-subcontractors

If you are a sub-subcontractor, material supplier to a subcontractor, or a sub-subcontractor, you now need to do everything.  

Notice to Owner/Notice to Contractor  

You need to timely serve a Notice to Owner no later than 45 days from your first work or delivery of materials on the project.

notice to owner

Notice of Nonpayment  

You need to serve a Notice of Nonpayment no later than 90 days from your last work.  

File suit on the bond

You need to file your lawsuit no later than one year from your last work or delivery of material on the project.  

Check for subcontractor bonds  

Remember that just like on public jobs, the party that you have a contract with or the party that stands between you and the general contractor may have a bond. And if they do, you may be able to make a claim against that subcontractor’s bond.

Disclaimer
THE INFORMATION ON THIS WEBPAGE IS NOT THE SAME AS LEGAL ADVICE. SUNRAY CONSTRUCTION SOLUTIONS, LLC IS NOT AN ATTORNEY OR A LAW FIRM. WE RECOMMEND THAT YOU CONSULT WITH AN ATTORNEY.
Ariela Wagner
Ariela Wagner
Ariela is the president and founder of SunRay Construction Solutions. She has over 18 years of construction industry experience.
Preliminary Notice| SunRay Notice
Sign up for Exclusive Lien Law InformationAll our latest blogs delivered hot to your inbox!
Oops! Something went wrong. Please check!
Subscribe to Newsletter